Request a Demo

Compliance & Data Protection

Legislation-Grade Security for Ontario Building & Licensing Data

Every permit application, building plan, inspection result, and business licence record is protected by infrastructure designed for Ontario's most regulated municipal data — from Building Code Act compliance to MFIPPA audit requirements.

0Regulations
0Frameworks
0Security Layers
0Audit Features

Canadian Municipal Compliance

Municipal & Provincial Regulations

Purpose-built for Canadian municipalities, with full alignment to federal, provincial, and municipal legislation governing public-sector data management.

Ontario

Complete compliance lifecycle from application through occupancy — permit records, plans examination documentation, inspection results, and orders are maintained with legislated retention periods and accessibility requirements.

Ontario

OBC-specific inspection checklists, compliance tracking by code section, and automated cross-referencing of submitted plans against applicable code requirements including SB-10/SB-12 energy compliance and AODA barrier-free design.

Ontario

Licensing bylaw authority, fee schedule governance, and enforcement powers under Part IV — business licence conditions, renewals, suspensions, and revocations managed with complete audit trail and legislative references.

Ontario

Applicant personal information, business licence details, and inspection records protected with purpose-limited collection, consent-tracked disclosure, and automated FOI response workflows. Field-level access control for PII.

Ontario

WCAG 2.1 AA compliant portals and digital permit documents — screen reader compatible, keyboard navigable, high-contrast modes, and plain-language communications. Building plans reviewed against AODA barrier-free design requirements.

Ontario

Fire code review circulation for assembly, institutional, and commercial occupancies — fire prevention officer clearance tracked within the permit lifecycle with OFC section references and inspection coordination.

Ontario

Automated development charge calculation at building permit issuance — residential (per unit by type), non-residential (per sq ft by use), with exemptions and credits tracked. Integration with municipal DC schedules.

6 Compliant1 Aligned7 Shown

Compliance is not a feature we bolted on after launch — it is the architectural foundation every line of code is written against. Canadian municipalities deserve a platform that treats their legislative obligations as first-class requirements.

Civic Engineering

· Platform Architecture Team

Regulatory Compliance

Industry Frameworks

Beyond municipal legislation, satisfies internationally recognized compliance frameworks.

Annual SOC 2 Type II audit covering security, availability, and confidentiality trust service criteria — with building plan and applicant personal information as in-scope data classes.

  • Security controls governing access to permit and applicant data across all microservices
  • Availability controls ensuring 99.95% uptime for online application intake and inspection scheduling
  • Confidentiality controls protecting building plans, inspection reports, and applicant PII
  • Change management controls for all platform code and configuration changes
  • Incident response procedures with municipality notification within 24 hours of confirmed breach

Information security management system covering permit data classification, access control policies, and encryption standards — externally audited with annual surveillance assessments.

  • Information asset classification for permit records, building plans, and applicant PII
  • Access control policies with 200+ RBAC permission atoms across all permitting roles
  • Cryptographic controls — AES-256 at rest, TLS 1.3 in transit, HSM key management
  • Physical security for Canadian data centres with biometric access and 24/7 surveillance
  • Business continuity planning with RPO <1hr and RTO <4hr across Canadian data centres

International standard for web accessibility, mandated for Ontario public sector under AODA — ensuring all permit portals and digital documents are accessible to all applicants.

  • Full keyboard navigation for all online permit application and status tracking functions
  • Screen reader compatibility tested with JAWS, NVDA, and VoiceOver
  • Colour contrast ratios meeting AA minimums (4.5:1 normal text, 3:1 large text)
  • Semantic HTML with proper heading hierarchy and ARIA landmarks in all portal pages
  • Accessible form labels, error messages, and validation feedback for permit application wizards
  • AODA alternative format generation for permit documents: large print, plain text, screen-reader-optimized

Ontario legislation governing access to municipal records and protection of personal privacy — permit applications, building plans, and inspection records subject to access request and disclosure requirements.

  • Complete audit trail of all data access, modification, and disclosure events with before/after snapshots
  • FOI request search tool spanning all permit, licence, and inspection data with redaction tools (s.6–15)
  • Consent tracking for personal information collection with legal authority reference (s.28(2))
  • Records retention schedules aligned with Ontario municipal records management guidelines
  • Privacy impact assessment tooling for new data collection within permit applications

Data Sovereignty

Building & Licensing Data Stays in Canada

Permit applications, building plans, inspection records, business licence data, and applicant personal information are stored exclusively in Canadian data centres — meeting both municipal policy and MFIPPA requirements.

DC-PrimaryOntarioTier IVDC-DRQuébecTier III+

Hosting

Canadian Only

Centres

3 Redundant

Encryption

AES-256

Sovereignty

PIPEDA / MFIPPA

Platform Security

Security Capabilities

Click any capability to explore the technical details behind each security layer.

Auditability

Audit Trail Features

Every action is logged, timestamped, and immutable — providing the complete audit trail required by provincial legislation and municipal accountability standards.

Layer 01

Every permit decision (approve, approve with conditions, refuse, revoke) logged with decision-maker identity, timestamp, reasoning, and legislative authority cited

Layer 02

Every access to submitted building plans (view, download, print) logged with user identity and purpose — prevents unauthorized distribution of proprietary construction documents

Layer 03

Inspection results form an immutable chain — each result references inspection type, OBC checklist items, pass/fail decision, inspector identity, GPS location, photos, and timestamp

Layer 04

Business licence lifecycle (application, department clearance, issuance, conditions, compliance checks, renewal, suspension, revocation) fully logged with timestamps and decision-makers

Layer 05

Every fee collected (permit fees, development charges, licence fees, inspection fees) logged with amount, payment method, receipt number, and linked to the originating application

Layer 06

Freedom of information requests against permit and licence records tracked from intake through response with disclosure decisions, redactions, and response timelines logged per MFIPPA

Layer 07

Data export events (bulk permit data, licence registry, inspection history) logged with user identity, export scope, format, and destination — retention policies enforce legislated minimums

Layer 08

Every data exchange between Civic Licenses & Permits and external systems (GIS, CRM, property tax, provincial) logged with payload summary, direction, timestamp, and success/failure status